Project Details
- Location
- Empire, California (City of Modesto Utilities Department)
- Contract Cost
- $4,135,308.00
- Date of Commencement
- July, 2024
- Date of Completion
- In progress
- Project Owner
- City of Modesto
- Contract Number
- 2024-07 (101403)
- Type of Contract
- Design Bid Build (DBB)
Project Description
TSI Engineering, Inc. delivered a full groundwater treatment facility upgrade for the City of Modesto Utilities Department at Well 312 in Empire, CA. The project modernized drinking water treatment through installation of granular activated carbon (GAC) vessels, chlorination systems, structural foundations, electrical integration, and instrumentation controls.
The improvements strengthened water quality compliance, enhanced operational reliability, and expanded system control under City of Modesto standards.
Scope Highlights
- Furnish and install dual GAC treatment vessels and carbon media
- Construct reinforced concrete foundations and treatment pad systems
- Install chlorination system and polyethylene chemical storage tank
- Install magnetic flow meters, analyzers, instrumentation, and process controls
- Electrical upgrades including MCC, VFD, generator integration, and exterior lighting
- Waterline tie-ins, disinfection, and flushline improvements
- Site restoration, fencing, and commissioning
- Compliance with City of Modesto Standard Specifications
Performance
- Coordinated civil, structural, mechanical, electrical, and process scopes
- Maintained compliance with prevailing wage and City Utilities Department standards
- Executed full commissioning and training for operational readiness