This project includes construction of a new Septic Tank, Sewer Lift Station, Valve Vault, and Controls; The replacement of air release valves on the force main, and the demolition of the existing lift station and manhole.
-
Demolish and remove underground existing sewer lift station and 4000gallon septic tank structures along with valves and vault boxes.
-
Install one 6'x6' x13' precast sewer lift station with single leaf hatch with safety grates,one 5000 gallon precast septic tank with three24"Diaentryrisersan done pre-engineered custom built9'-6"x5'-6"precast valve vault with
4'-6"x8'-6" double lead access hatch door and a safety ladder rungs. Which required excavation and shoring activities.
-
The project scope includes the connecting the existing 6" main inlet to new sewage lift station system and connection to an outlet including installation of 5SARVs.
-
The scope also includes the installation of (2) 10HP sewage sump pumps with guide-rails and chain lift mechanism for maintenance purposes
-
Installation also involves installation of new electrical and communication work including new conduits, conductors, GRSS boxes and EYSX with NEMA 4x enclosures
-
The scope also involves the installation of new pump control panel that will be integrated with existing comm panel which will be reprogrammed with required PLC/IO cards and SCADA monitoring system.
-
Re-installation of required disturbed permanent fencing.
-
Finish grading with 4" of 3/4" crushedrocks.
-
The work also includes the construction of 300+ LFT access road from campground to the lift station including excavation, backfilling with AB and compaction, finish grading 4" with 3/4" crushedrocks.
-
The work also involves the preparation of WPCP and installation of temp erosional control.
-
Preparation of As-builts and O&M/Program training.