LINDA COUNTY WATER DISTRICT, EQUALIZATION AND SLUDGE STORAGE PROJECT

  •    Location: 1280 Scales Avenue Marysville, CA 95901
  •    Contract Cost: $4,389,786.00
  •  Date of Commencement: December 10, 2021
  •  Date of Completion: July 25, 2022
  •   Project Owner: : Yuba County, State of California
  •  Contract Number: 2070013*00

TSI Engineering Inc. (TSI) constructed 8-million-gallon sludge sewage basin facility at the Linda County Water District, California. Our scope of work encompassed constructing a 8-million-gallon (495 ft. x 285 ft. x 12 ft. deep) capacity concrete-lined equalization (EQ) and sludge storage basin, including Decant Structure (42 ft. x 17 ft. x 16 ft deep) showcasing seamless coordination. The project involved the 45,000 yd earth work, reinforcement metal 20 tons #4 , 198 tons #5 and 31 tons of #7 rebars, 5015 cy of 4000 psi cement concrete, precise installations of 6” digested sludge, 16” decant, 18” raw sewage, and 4” water piping. The majority of concrete was poured during nighttime to address limitations posed by ambient temperatures. An access road was also build for convenience to dispose of dry sludge. Linda County has upgraded its sewage water facility to handle future demands and challenges from the growing local population. Thanks to TSI for constructing the new state-of-the-art sludge facility ensures advanced capabilities.

Our construction management professionals organize, lead and manage the people, materials and processes of truction utilizing construction management professionals.

4600 Roseville Rd. Suite 140
N Highlands, CA 95660