  •    Location: Shandon Rest Area Shandon, San Luis Obispo, CA 93461
  •    Contract Cost: $1,239,367.23
  •  Date of Commencement: 23 September, 2020
  •  Date of Completion: November 12th, 2021
  •   Project Owner: : Department of Transportation (DOT)- Caltrans
  •  Contract Number: 05-1G3704

The project's ambit encompasses a spectrum of pivotal activities, namely Site Management, Traffic Control System implementation, Drainage Protection, Concrete Washout facilitation, Roadside Clearing, and the meticulous relocation of Picnic Tables. In addition, our responsibilities encompass the vigilant scrutiny, proficient operation, and strategic oversight of Irrigation facilities. Furthermore, we prioritized erosion control measures and executed concreting endeavors to enhance the quality of the sidewalk infrastructure. Notably, each of these undertakings was executed with a pronounced emphasis on ensuring effective drainage mechanisms, all within the context of the comprehensive site survey conducted at the esteemed Shandon Rest Area stop..

Managing the site and executing the sidewalk construction were integral aspects of our endeavor.

  • TSI’S employee diligently removed all wood paneling and trim from walls and windows, setting the stage for subsequent enhancements.
  • The metal canopy was skillfully installed, and poured the concrete base pad, in addition to conducting various other concrete-related tasks.
  • We revamped the wastewater treatment system with a focus on modifying the surface wetlands area. This involved replacing existing wood chips with new ones, alongside introducing pea gravel in designated sections.
  • Our efforts extended to upgrading the water system, involving alterations to both the Septic tank 25000 Gallon-10ft and Recirculation tanks.
  • Significant enhancements were made to the Comfort Station rooms, complemented by the installation of essential signage and convenient baby changing stations.
  • Precision was our guide in the plumbing realm as we meticulously integrated plastic PVC Schedule 40 pipes in accordance with project requirements.
  • Picnic tables were relocated according to the project plans, and we conducted trenching and excavation to facilitate pipeline and plumbing fixture arrangement at the job site.

Our construction management professionals organize, lead and manage the people, materials and processes of truction utilizing construction management professionals.